Mode Engineering

JUMBO PEANUT CLUSTER IN KILLINOCHCHI

Features

  1. Processing Factory:
    A dedicated space designed with standard techniques for processing the Jumbo Peanuts. This includes drying, cleaning, sorting, and potentially packaging the peanuts for market release.
  2. Cold Rooms:
    Temperature-controlled storage areas will be included in the design, allowing for proper preservation of the peanuts and maintaining their quality before distribution.
  3. Factory Steel Roof:
    A steel roof will be used for the factory building, ensuring durability, strength, and longevity of the structure. It will provide protection to the processing areas from environmental elements.
  4. External Drainage Systems:
    A comprehensive drainage system will be implemented around the factory to manage water runoff, reduce flooding risks, and ensure proper site drainage, especially during heavy rains.

  5. Parking Locations:
    The project includes designated parking areas for vehicles, ensuring proper space for transportation and logistics, such as trucks and delivery vehicles for peanut collection and distribution.